What is the 2026 Asphalt Paving and Resurfacing project?
The Capital Projects division undertakes an annual program of roadway paving and resurfacing aimed at renewing and extending the life of the Town’s road infrastructure. Candidate roadways are identified through various condition assessments, maintenance histories, resident complaints, and future development considerations. The 2026 program is anticipated to include 6km of roadway repaving and resurfacing, with construction expected to commence in Q2 2026.
Road Closures and Traffic Control
The 2026 project may require full road closure (local traffic permitted) or reduced lanes during paving activity. Notice of construction will be delivered to affected residents prior to construction.
Will roads remain open during construction?
During reconstruction, roads will generally remain open to local traffic. However, temporary detours or periods of limited access may be required. For your safety, please follow all posted signage and directions from flag personnel.
Will I still be able to access my driveway?
Vehicle access to driveways will be maintained as much as possible. Short-term interruptions may occur when work is taking place directly in front of your property. If your driveway access will be blocked for an extended period, the contractor will notify you in advance.
What happens to landscaping or items located on Town property?
Some residents may have installed fences, irrigation systems, landscaping, or other features within Town property limits (e.g., the boulevard area). These items may conflict with construction activities.
Before construction begins, Town staff or a representative will conduct a visual inspection to identify potential conflicts. Residents will be asked to remove any affected items to prevent damage. Please note that, in accordance with Town by-laws, the Town cannot repair, replace, or reinstate features installed on Town property.
What are the construction work hours?
Construction activities will follow the Town’s noise by-law, with work permitted between 7:00 a.m. and 7:00 p.m., Monday to Saturday. Work outside these hours, including Sundays and holidays, will only occur in emergency situations.
Will garbage, recycling, and compost collection continue as usual?
Yes, collection schedules will remain unchanged during construction. Please continue to place materials as close as possible to their usual location by 7:00 a.m. on your collection day.
If access is restricted, the contractor will relocate your bins to an appropriate pick-up point. To ensure your bins are returned, please clearly label them with your street address.
What happens to my driveway if it is affected by construction?
Driveways impacted by road construction will be repaired or replaced as needed to restore them to their original condition within the project limits.
Any driveway work beyond the construction area (on private property) is the responsibility of the homeowner. The Town is not involved in or responsible for private agreements related to driveway replacement and does not endorse arrangements with contractors or subcontractors.
Project Technologist
Town of Stouffville
Sobanan.Selvan@townofws.ca
111 Sandiford Drive, Stouffville ON, CA
customer.service@townofws.ca
(905) 640-1900
Accessible formats available upon request. Contact 905-640-1900 or customer.service@townofws.ca for assistance.
© 2024 Town of Whitchurch-Stouffville | Privacy and Disclaimer